Boiler Erection and Repairs
Boiler Repairs and Erection
-
Supply, fabrication, erection /fitting and hydraulic test with all necessary I.B.R. Formalities.
-
Replacement of smoke tubes, boiler bank tubes, furnace tubes and membrane panel tubes as per clients' requirements.
-
Super heater coils and economiser coils as per client’s requirements.
-
Pressure ranges from 3.5 kg/cm2 (g) to 125 kg/cm2 (g ).
-
Temperature ranges from 100 C to 520 C.
-
Tubes Material specifications BS 3059 PART I GR 320 E.R.W., BS 3059 PART II GR 360 E.R.W. and SA 210 GR A1.
-
Tubes Material specification SA 213 GR P 11 and SA 213 GR P 22. As per temperature conditions.
Boiler shifting work with all accessories pressure parts as well as non-pressure parts with all I.B.R. Formalities and permissions. As per clients' requirements.
Repairing of boiler pressure parts capacity from 1 TPH to 100 TPH and boiler pressure range 3.5 kg/ cm2 (g) to up to 125 kg/cm2 (g)