top of page
WhatsApp Image 2023-12-23 at 10.52.20.jpeg

Boiler Erection and Repairs

Untitled design (4).png

Boiler Repairs and Erection 

  • Supply, fabrication, erection /fitting and hydraulic test with all necessary I.B.R. Formalities. 

  • Replacement of smoke tubes, boiler bank tubes, furnace tubes and membrane panel tubes as per clients' requirements. 

  • Super heater coils and economiser coils as per client’s requirements. 

  • Pressure ranges from 3.5 kg/cm2 (g) to 125 kg/cm2 (g ). 

  • Temperature ranges from 100 C to 520 C. 

  • Tubes Material specifications BS 3059 PART I GR 320 E.R.W., BS 3059 PART II GR 360 E.R.W. and SA 210 GR A1. 

  • Tubes Material specification SA 213 GR P 11 and SA 213 GR P 22. As per temperature conditions.

 

Boiler shifting work with all accessories pressure parts as well as non-pressure parts with all I.B.R. Formalities and permissions. As per clients' requirements.

Repairing of boiler pressure parts capacity from 1 TPH to 100 TPH and boiler pressure range 3.5 kg/ cm2 (g) to up to 125 kg/cm2 (g)

On-Site Work

Untitled design (4).png

Enquiries

Get in touch so we can start working together.

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Thanks for submitting!

bottom of page